What’s included in the renovation at Chart Hills
The renovation of the tee boxes will begin by completely re-laying three tee boxes per hole. The tee boxes renovated will be the standard playing tees – blue, yellow, and red. After completion of the first group of holes the team will move onto the remaining holes.
This period will also see the completion of the six-hole, Sir Nick Faldo-designed par-3 course – with holes ranging from 50 to 100 yards. Inspired by the career of the former world number one, the short game loop will offer huge variety, with specific design features dawn from iconic holes at St Andrews, Augusta National, and the main course at Chart Hills.
In addition, a 668-square metre putting green located beside the first tee, also created by Faldo Design, will be officially opened for use. The green features elements of Faldo’s favourite greens from his major wins at St Andrews, Augusta and Muirfield – including its very own Valley of Sin. The new putting green was open for use on August 1.
Unlike 2020, when the club had to close the course for renovation work to take place, Chart Hills will remain open throughout the project, allowing members and visitors to play a continually improving course with minimal disruption.
The post Chart Hills begins second phase of renovation project appeared first on Golf News.
Leave a comment